High Efficiency Wash Glass Machine for Reflective Glass after Grinding Edging Machine
General introduction
Washing machine has 3 sections include glass in-feed, wash&dry, glass out-feed.
Speed optional: 12M/15M/18M.
Independent working, on-line working, off-line working.
Manufacturing line connecting optional: double edger, four side seaming machine, silk-print line, etc
Porcessing glass series: tempered glass, Low-e glass, insulating glass, laminating glass, coating glass, solar glass, decoration glass, etc
Models:
model No. |
max. glass width |
min. glass size |
glass thickness |
washing speed |
AR-QX1200A |
1200mm |
250X250mm |
2-30mm |
0.5-15M/min |
AR-QX1600A |
1600mm |
300X300mm |
2-30mm |
0.5-15M/min |
AR-QX2000A |
2000mm |
350X350mm |
2-30mm |
0.5-15M/min |
AR-QX2500A |
2500mm |
400X400mm |
2-30mm |
0.5-15M/min |
AR-QX3000A |
3000mm |
400X400mm |
2-30mm |
0.5-12M/min |
AR-QX3300A |
3300mm |
450X450mm |
2-30mm |
0.5-10M/min |
Machine part details:
step 1
pre-wash: high pressure spraying
step 2
pre-blow: blow away the
dirty water
step 3
deeply washing: glass powder, dust, stain, etc
step 4
quick dry: smart air knife
with large air blower
water proof structure:
sealring, no water leaking, no water splashing.
good protection for bearing.
brush motor indepent work:
upper motor transmit the top brush
lower motor transmit the bottom brush
enough power, enough performance
PLC with HMI:
simple operation.
optional connect to manufacturing line
for automatic processing.
Company & Delivery
Relating machine
FQA
1. Are you a manufacturer with export right?
Yes
2. What's the warrenty and how?
Twelve months. Free change for motors & appliance during the period.
3. How to install and train?
method A: online communication, face to face teaching and training.
method B: ask local technician parter to customer company for current stateinstallation.
mothod C: seller send technician from china to customer company.
4. It is complex in machine assembly?
No, machine will be separate into 3 main parts.
Set the level and connect power only.
4. Payment terms?
T/T, L/C
5. Incoterms?
FOB, CIF, EXW
6. How long can I get the machines?
machine leadtime 45 days+payment time 10days+delivery period 15days=70days
7. How to pack and make sure machine no damage during transport?
Cotton + water prood plastic roller to avoide hitting.
Firm the machine with screw and belt to avoide swinging